AUTONOMOUS DECISION MAKING IN VERY LONG TRAVERSES (ADE)

You are here: Home » Milestones

Milestones

ADE will last 24 months starting from March 1st, 2019.

The project milestones are depicted in table here below.

Mile-stone
No.
MilestoneAcronym Milestone Name Related Work Package(s) EstimatedDate Location

Means of Verification

MS-1 KOM Kick-Off Meeting WP 0 T0 GMV Project started. TN0.1 PMP review an
KOM minutes (MoM)
MS-2 PM1 Progress Meeting 1 WP 1 T0+1.5m Telco MoM with progress status / WP110 and WP120
MS-3 SRR System Requirements review WP 1 TO+3m TAS-I SRR / Delivered SRR Doc.
MS-4 PM2 Progress Meeting 2 WP 2 T0+5m Telco MoM with progress status
MS-5 PM3 Progress Meeting 3 WP 2 T0+7m Telco MoM with progress status
MS-6 PDR Preliminary design review WP 2 TO+9m GMV PDR held. Preliminary Design data package delivered. PDR MoM.
MS-7 PM4 Progress Meeting 4 WP 3 T0+11m Telco MoM with progress status
MS-8 PM5 Progress Meeting 5 WP 3 T0+13m Telco MoM with progress status
MS-9 CDR Critical Design Review WP 3 T0+15m GMV CDR held. Detailed Design data
package delivered. ADE Prototype.
Simulator based V&V tests
MS-10 PM6 Progress Meeting 6 WP 4 T0+17.5m Telco MoM with progress status
MS-11 PM7 Progress Meeting 7 WP 4 T0+20m Telco MoM with progress status
MS-12 TRR Test Readiness Review WP 4 T0+22m GMV TRR held. ADE HW and ADAM SW ready for testing. Preliminary ADE
outdoor field tests
MS-13 PM8 Progress Meeting 8 WP 4 T0+23m Telco End of analogue Field test
MS-14 FA Final Acceptance/ WP 5 T0+24m GMV FA held. Test results validated. ADE
HW and ADAM accepted. FA MoM.
MS-15 FP Final Presentation WP 0 T0+24m PSA Final report & Final Presentation
delivered.

List of milestones.